DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADB086678
Title:
ICAM (Integrated Computer Aided Manufacturing) Conceptual Design for Computer-Integrated Manufacturing. Volume 3. Part 3. Tasks C and E. Integrated Composite Center Requirements and Preliminary Design System Environment Document (SED).
Descriptive Note:
Final technical rept. 1 Oct 81-29 Jun 84,
Corporate Author:
LTV AEROSPACE AND DEFENSE CO DALLAS TX VOUGHT AERO PRODUCTS DIV
Report Date:
1984-06-29
Pagination or Media Count:
670.0
Abstract:
This document, Vol. III, Part 3, of the Final Technical Report contains the Integrated Composites Center System Environment Modeling and Analysis results. This document establishes the baseline environment in which the Integrated Composites Center will be designed and implemented. The models presented utilize the IDEF methodology for function and information modeling.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE