DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADB086101
Title:
ICAM (Integrated Computer Aided Manufacturing) Conceptual Design for Computer-Integrated Manufacturing. Volume 2, Part 4. Task B. Establishment of the Factory of the Future Conceptual Framework System Requirements Document (SRD).
Descriptive Note:
Final rept. 1 Oct 81-29 Jun 84.
Corporate Author:
LTV AEROSPACE AND DEFENSE CO DALLAS TX VOUGHT AERO PRODUCTS DIV
Report Date:
1984-06-29
Pagination or Media Count:
263.0
Abstract:
This document contains the Factory of the Future Conceptual Framework System Requirements. This document defines the Conceptual System Requirements for the enhancement of aerospace factory operations in the 1995 time frame. In particular, it defines requirements that will ultimately satisfy needs reflected in the Needs Analysis Document.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE