Accession Number:
ADB068012
Title:
Information System Requirements for ICAM Sheet Metal Center. Volume II. System Requirements.
Descriptive Note:
Final technical rept. 1 Oct 80-30 Sep 81,
Corporate Author:
LITTLE (ARTHUR D) INC CAMBRIDGE MA
Personal Author(s):
Report Date:
1982-07-10
Pagination or Media Count:
168.0
Abstract:
This Final Report describes results of the Computer-Based Information System CBIS project conducted for the Integrated Computer Aided Manufacturing ICAM Program. This project Priority 3101 defined the requirements of a computer network that would integrate the functions of aerospace batch manufacturing. This Final Report is presented in four volumes. This part, Volume 2, is a System Requirements Document, which describes the concepts, problems, objectives, benefits, and capabilities associated with CBIS implementations.
Descriptors:
Subject Categories:
- Computer Hardware
- Manufacturing and Industrial Engineering and Control of Production Systems