DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADA995411
Title:
OPERATION REDWING. Project 1.10. Blast over Vegetated and Cleared Areas
Descriptive Note:
Corporate Author:
LOCKHEED MARTIN CORP ALBUQUERQUE NM SANDIA CORP
Report Date:
1985-09-01
Pagination or Media Count:
21.0
Abstract:
Measurements were made to determine the difference in blast effects over a surface covered with low shrubs and grass and over a cleared sandy surface in the precursor region, and an attempt was made to correlate this difference with measurements of preshock sound speed over the surface. Overpressure was measured with ground-baffle gages and with pivot-static gages at 3-foot elevations. Dynamic pressures were measured at the 3-foot elevation with the same gages. Measurements were made at the same ground ranges for vegetated surface as for the sandy surface. The vegetation reduced the severity of the precursor, showing later arrival times and smaller dynamic pressures than over the cleared area. The overpressures over the vegetation were the same at the ground and 3-foot levels. No measurements of sound speed after zero time were obtained, so a correlation is not possible.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE