Abstract:

The various plans of the government considers as possible solutions to the navigation hazards existing in Village Creek are 1 Plan I A channel 8 feet deep and 80 feet wide from the mouth of Village Creek, station 0 000, upstream to the Porpoise Fish Company terminal, station 11750, and closure of the cutoff. The channel would be dredged to a 2-foot overdepth for advanced maintenance, would have side slopes of 4 horizontal to 1 vertical, and would follow the general alignment of the natural channel 2 Plan I-a The same as Plan I excluding closure of the cutoff 3 Plan II A channel 8 feet deep and 80 feet wide from the Porpoise Fish Company terminal, station 11750, upstream to the Cedar Grove Fish Company, station 27500. The channel would be dredged to a 2-foot overdepth for advanced maintenance, would have side slopes of 4 horizontal to 1 vertical, and would follow the general alignment of the natural channel 4 Plan III This plan, combining Plans I and II, consists of an improved channel 8 feet deep and 80 feet wide, dredged to a 2-foot overdepth for advanced maintenance, from the mouth of Village Creek, station 000 upstream to the Cedar Grove Fish Company terminal, station 27500, and would include closure of the cutoff 5 Plan III-a The same as Plan III excluding closure of the cutoff.

Subject Categories:

  • Structural Engineering and Building Technology

Distribution Statement:

APPROVED FOR PUBLIC RELEASE