Abstract:

This supplemental Environmental Assessment SEA examines the potential environmental impacts resulting from the changes to the Proposed Action during the design of Phases 2 and 3 of the Mid-Bay Bridge Connector that have occurred since the original Environmental Assessment EA dated November 2008 and Finding of No Significant ImpactFinding of No Practicable Alternative FONSIFONPA signed 05 December 2008 the original 2008 EA is incorporated by reference per 40 Code of Federal Regulations CFR 1502.21 USAF, 2008. Eglin Air Force Base AFB has determined that a SEA is needed when changes to the Proposed Action involve changes in environmental impacts, or when there are new circumstances or information relating to environmental impacts. The environmental analysis contained within this SEA will determine if there are significant impacts requiring preparation of an Environmental Impact Statement EIS or if the impacts are not significant, a FONSIFONPA. The Mid-Bay Bridge Authority MBBA, through its contractor HDR, prepared this SEA in accordance with the requirements of the National Environmental Policy Act NEPA of 1969 42 United States Code U.S.C. 4321 et seq., the Council on Environmental Quality CEQ regulations of 1978 40 CFR 1500-1508, and the Air Force s Environmental Impact Analysis Process EIAP 32 CFR Part 989.

Subject Categories:

  • Civil Engineering
  • Logistics, Military Facilities and Supplies
  • Environmental Health and Safety

Distribution Statement:

APPROVED FOR PUBLIC RELEASE