Accession Number:

ADA634581

Title:

Environmental Assessment, Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06). Volume 1, Beale Air Force Base, California

Descriptive Note:

Corporate Author:

HDR ENVIRONMENTAL OPERATIONS AND CONSTRUCTION INC ENGLEWOOD CO

Report Date:

2005-07-01

Pagination or Media Count:

103.0

Abstract:

The purpose of the WINDO Implementation Plan at Beale AFB is to improve the facility planning process, capture the Wing Commander s vision of what infrastructure improvements are necessary to support the base s on-going mission, and link the Base General Plan to individual funding programs such as Military Construction MILCON Operations and Maintenance OM, Sustainment, Restoration, and Modernization for Contract SRMC Environmental Restoration Account ERA Defense Energy Systems Command DESC Anti-TerrorismForce Protection ATFP Quality of Life QOL, Army Air Force Exchange Service AAFES,and other programs to provide a solid plan that both the base and Air Combat Command ACC agree upon and understand. The objective of this Environmental Assessment EA is to disclose and analyze potentially significant environmental impacts expected from implementation of Beale AFB s WINDO Implementation Plan and development projects and long-term mission-based actions which comprise the plan the Proposed Action. A secondary objective of this EA is to determine the potential cumulative impacts from Beale AFB s mission base-wide.

Subject Categories:

  • Structural Engineering and Building Technology
  • Logistics, Military Facilities and Supplies
  • Environmental Health and Safety

Distribution Statement:

APPROVED FOR PUBLIC RELEASE