Accession Number:

ADA634579

Title:

Environmental Assessment, Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06). Volume 2, Beale Air Force Base, California

Descriptive Note:

Corporate Author:

HDR ENVIRONMENTAL OPERATIONS AND CONSTRUCTION INC ENGLEWOOD CO

Report Date:

2005-08-01

Pagination or Media Count:

219.0

Abstract:

The Proposed Action consists of 12 projects. These 12 projects construction, demolition, and restoration are listed below. No changes in personnel requirements or aircraft operations would occur.

Subject Categories:

  • Structural Engineering and Building Technology
  • Logistics, Military Facilities and Supplies
  • Environmental Health and Safety

Distribution Statement:

APPROVED FOR PUBLIC RELEASE