Accession Number:

ADA612571

Title:

Final Finding of No Significant Impact: Maintenance, Repair, and Overhaul Technology Center Acquisition Tinker Air Force Base Oklahoma City, Oklahoma

Descriptive Note:

Final rept.

Corporate Author:

AMEC EARTH AND ENVIRONMENTAL INC SANTA BARBARA CA

Report Date:

2013-04-18

Pagination or Media Count:

128.0

Abstract:

This document was prepared using data and information obtained in 2011. The document is currently recertified as the information collected during that time period is accurate and reflects the Proposed Action of acquiring the MROTC and validates that there are no significant impacts associated with the leasing action. As required, the document was not released to the public until after the approval of the Land Moratorium Waiver Request by the Under Secretary of Defense ATL on 13 February 2013. The data within the EA was updated only to verify AMEC Solutions results and to include the public notification information. Originally, the lease was intended to be for 8 years but through negotiations was reduced to 7 years. The MROTC is a 156,254-square-foot full-service aircraft modification facility comprising three hangars, an administrative area, and a 283,000-square-foot aircraft operations ramp situated on 52.98 acres adjacent to Tinker AFB. Through the Oklahoma City Air Logistics Center, the USAF rents 156,254 square feet of hangar space and administrative area and a 283,000-square- foot aircraft operations ramp at the MROTC under short-term service contracts with the facilitys primary lessee, Boeing Company Boeing. The use of this space allows the 76 Aircraft Maintenance Group AMXG to meet its current mission requirements.

Subject Categories:

  • Aircraft
  • Logistics, Military Facilities and Supplies

Distribution Statement:

APPROVED FOR PUBLIC RELEASE