Accession Number:

ADA609328

Title:

Final Environmental Assessment: For Joint Base Anacostia-Bolling Master Plan District of Columbia

Descriptive Note:

Final rept.

Corporate Author:

AECOM ALEXANDRIA VA

Report Date:

2010-09-30

Pagination or Media Count:

143.0

Abstract:

This environmental assessment EA evaluates the potential impacts on the human and natural environments of implementing the Joint Base Master Plan at Joint Base Anacostia-Bolling in the District of Columbia. The proposed action is to implement the new Joint Base Master Plan at Joint Base Anacostia-Bolling, thereby optimizing a newly formed Joint Base into a singlefunctioning installation to further the purpose of the 2005 BRAC mandate. More specifically, it fulfills the guidance provided by Department of Defense Supplemental Guidance for Implementing and Operating a Joint Base for Real Property Matters, dated 15 April 2008 to develop a Joint Base Installation Master Plan. In addition to the No Action Alternative, two alternatives are considered in the EA the No Master Plan Alternative and the Joint Base Master Plan Alternative preferred. Neither action would result in significant adverse impacts on the human environment. Preparation of an environmental impact statement is not required.

Subject Categories:

  • Logistics, Military Facilities and Supplies
  • Environmental Health and Safety

Distribution Statement:

APPROVED FOR PUBLIC RELEASE