Accession Number:

ADA608669

Title:

AGOR 28

Descriptive Note:

Bi-weekley progress rept.

Corporate Author:

SCRIPPS INSTITUTION OF OCEANOGRAPHY LA JOLLA CA

Personal Author(s):

Report Date:

2014-08-28

Pagination or Media Count:

9.0

Abstract:

1. Meetings i. Participated in weekly conference calls. ii. Design Review 16 2. The following Shipyard Question Submittals were reviewed and commented on No questions this reporting period. 3. Logistics i. Continuing to review Vendor Recommended Spares VRS. ii. Continuing to review Technical Manuals and Supplemental Information. iii. Continuing to work on initial outfitting lists for Sally Ride. iv. Working on NS5 Hierarchy 4. Sally Ride Progress HVAC Ducting installation is moving forward with large sections of ductwork being installed on the main deck port and starboard. HVAC crew is laying out runs on the foc sle and 01 decks. Pilot House Void overhead insulation has been completed. In addition to the necessary fire protection, the insulation has excellent sound deadening properties, resulting in a much quieter Pilot House deck. Electrical Yard continues to mount and stage panels and controllers throughout the vessel. Shore Power connection mounted on Main Deck. Very little cabling is being run at this time as most of the yard electricians are on Armstrong. During today s walk through, no electricians were seen on board Ride. Transceiver Room EK80 cable tray installed in way of fuel tank. Painting throughout the vessel continues.

Subject Categories:

  • Marine Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE