DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADA599385
Title:
The Army's Ground Combat Vehicle (GCV) Program: Background and Issues for Congress
Descriptive Note:
Congressional rept.
Corporate Author:
LIBRARY OF CONGRESS WASHINGTON DC CONGRESSIONAL RESEARCH SERVICE
Report Date:
2014-02-28
Pagination or Media Count:
14.0
Abstract:
In April 2009, then-Secretary of Defense Gates announced he intended to significantly restructure the Army s Future Combat System FCS program. The FCS was a multiyear, multibillion dollar program that had been underway since 2000 and was at the heart of the Army s transformation efforts. In lieu of the cancelled FCS manned ground vehicle MGV, the Army was directed to develop a ground combat vehicle GCV that would be relevant across the entire spectrum of Army operations and would incorporate combat lessons from Iraq and Afghanistan. The Army reissued a request for proposal RFP for the GCV on November 30, 2010, and planned to begin fielding the GCV by 2015-2017. On August 17, 2011, the GCV program was approved to enter the Technology Development Phase of the acquisition process and, a day later, the Army awarded two technology development contracts 439.7 million to the General Dynamics-led team and a second contract for 449.9 million to the BAE Systems-Northrop Grumman team. Starting in May and running through June 2012, the Army tested a number of foreign candidates during a Network Integration Exercise. This test informed the Army s Analysis of Alternatives AoA, which is a requirement before the GCV program can progress to the next developmental phase. The AoA reportedly found no suitable existing, less expensive combat vehicles that could meet the Army s GCV requirements. On January 16, 2013, the Department of Defense DOD initiated a series of major GCV program changes which, while slipping the program schedule to the right and going to a single competitor during Engineering and Manufacturing Development, could save over 4 billion from FY2014 to FY2019.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE