Accession Number:

ADA592153

Title:

Air Vehicle Integration and Technology Research (AVIATR). Task Order 0003: Condition-Based Maintenance Plus Structural Integrity (CBM+SI) Demonstration (September 2011 to March 2012)

Descriptive Note:

Interim rept. 1 Sep 2011-31 Mar 2012

Corporate Author:

BOEING CO HUNTINGTON BEACH CA ENGINEERING OPERATIONS AND TECHNOLOGY

Report Date:

2012-03-01

Pagination or Media Count:

77.0

Abstract:

This report summarizes progress made on the AVIATR contract, Task Order 0003, Condition-Based Maintenance Plus Structural Integrity - Option Phase during the reporting period September 2011 through March 2012. The updated CBMSI process flowchart is presented, which represents an overview of the work being performed on this project. The remaining sections discuss topics within the flowchart that have been tasked during the reporting period.

Subject Categories:

  • Attack and Fighter Aircraft
  • Mechanics

Distribution Statement:

APPROVED FOR PUBLIC RELEASE