Accession Number:

ADA586666

Title:

Air Vehicle Integration and Technology Research (AVIATR). Task Order 0003: Condition-Based Maintenance Plus Structural Integrity (CBM+SI) Demonstration (April 2011 to August 2011)

Descriptive Note:

Interim rept. 1 Apr-31 Aug 2011

Corporate Author:

BOEING CO HUNTINGTON BEACH CA ENGINEERING OPERATIONS AND TECHNOLOGY

Report Date:

2011-08-01

Pagination or Media Count:

86.0

Abstract:

This report summarizes progress made on the AVIATR contract Task Order 3, Condition Based Maintenance plus Structural Integrity-Option Phase during the reporting period April 2011 through August 2011. Similar to previous progress reports on this project, the report follows the process detailed in the CBMSI flowchart. A detailed general purpose flow chart is presented initially, which is followed by a discussion on the specific application for the process on the F-15 wing demonstration. The remaining sections discuss topics within the flowchart that have been tasked during the reporting period. In this progress report tasks related to in-situ sensor system capability analysis, updates to the component level risk analysis and cost benefit analysis are discussed.

Subject Categories:

  • Aircraft

Distribution Statement:

APPROVED FOR PUBLIC RELEASE