Accession Number:

ADA513885

Title:

FCS LUT 3 LVC MS&I Requirements Study Overview

Descriptive Note:

Briefing charts

Corporate Author:

ARMY TEST AND EVALUATION COMMAND ALEXANDRIA VA

Personal Author(s):

Report Date:

2009-01-13

Pagination or Media Count:

18.0

Abstract:

STUDY PURPOSE AND DELIVERABLES The purpose of the Study Team is to Define the FCS Core Program LUT 3 Live, Virtual, and Constructive LVC Modeling and Simulation MS and Instrumentation MSI to include real-time casualty assessment RTCA, data collection, reduction and visualization requirements and the aligned MSI capabilities to those requirements. Types of requirements considered as part of the study MS by Warfighting Function DCAI Threat Training supporting the LUTSoldier Federation interoperability Recommend an architecture to support the LVC MSI Federation. Endstate of the study is defined by A documented in DOORS set of Operational Test and Evaluation requirements A proposed LVC MSI Federation.

Subject Categories:

  • Test Facilities, Equipment and Methods
  • Military Operations, Strategy and Tactics

Distribution Statement:

APPROVED FOR PUBLIC RELEASE