The basic premise is that a legacy part design that was originally optimized for one manufacturing process may either be impossible to produce by another process, or too costly. To re-manufacture a replacement part, the original geometry and the material need to be modified such modification must be done without violating the inter-facing, functional and structural constraints. The Rapid Re-Engineering System RRES is envisioned to serve as a bridge.