Accession Number:

ADA496865

Title:

Environmental Assessment 819th Red Horse Five Year Plan, Malmstrom Air Force Base, Montana

Descriptive Note:

Corporate Author:

RAPID ENGINEER DEPLOYABLE HEAVY OPERATIONAL REPAIR SQUADRON ENGINEER (RED HORSE) 823D TYNDALL AFB FL

Personal Author(s):

Report Date:

2007-08-07

Pagination or Media Count:

96.0

Abstract:

This EA analyzes the potential environmental impacts from the proposed and alternative actions at Malmstrom AFB in Great Falls Montana. The Proposed Action supports mission requirements of the 819th RHS. Construction of new facilities and expansion of existing facilities is needed to address the shortfall in space required by the 819th RHS. The purpose of this action is to provide adequate space for the efficient execution of the 819th RHS mission.

Subject Categories:

  • Humanities and History
  • Logistics, Military Facilities and Supplies
  • Air Pollution and Control
  • Noise Pollution and Control
  • Solid Wastes and Pollution and Control
  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE