Accession Number:

ADA467331

Title:

Quarterly Groundwater Monitoring First Quarter Sampling Results fort Dix, New Jersey

Descriptive Note:

Quarterly rept. no. 1

Corporate Author:

DAMES AND MOORE BETHESDA MD

Personal Author(s):

Report Date:

1990-05-29

Pagination or Media Count:

70.0

Abstract:

The first quarter sampling activities included a reconnaissance survey to locate and inspect the wells at the landfill and to select those to be included in the Monitoring Program. As a result of the survey, two wells MW-8 and WES-3, which were vandalized or otherwise damaged, were excluded from the Monitoring Program. The selected wells and some related data are listed in Table 1. The locations of the wells are shown in Figure 1. The wells were purged and sampled in accordance with procedures specified in the Draft Sampling and Analysis Plan SAP, Fort Dix Follow-on Remedial InvestigationFeasibility Study, prepared by Dames Moore. The sample containers were labeled, packed on ice in coolers, and shipped overnight with completed chain-of-custody forms to ESE for chemical analysis. The samples were analyzed for VOCS as well as for total and dissolved priority pollutant metals and iron. The analytical results are presented in Tables 2 and 3. Table 2 shows only the results for analyte concentrations above detection limits while Table 3 presents all analytical data.

Subject Categories:

  • Organic Chemistry
  • Hydrology, Limnology and Potamology
  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE