Accession Number:

ADA454573

Title:

Labor Standards Application Program, Phase 4 - FY-83, Blast and Paint Shops

Descriptive Note:

Final rept.

Corporate Author:

PETERSON BUILDERS INC STURGEON BAY WI

Personal Author(s):

Report Date:

1984-12-28

Pagination or Media Count:

53.0

Abstract:

This report describes the development of labor standards during ship construction towards controlling production costs in the two closely related areas of blasting and painting. The overall objective of this Research Program is to reduce the cost of building ships. The objective of this specific project in the blastpaint areas was to improve planning, scheduling, production control, and worker productivity through the application of labor standards, and thereby reduce the cost of blastingpainting operations.

Subject Categories:

  • Manufacturing and Industrial Engineering and Control of Production Systems
  • Personnel Management and Labor Relations
  • Ceramics, Refractories and Glass
  • Marine Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE