Accession Number:

ADA393330

Title:

Avionics System Performance Management

Descriptive Note:

Final rept. 23 Sep 1993-30 May 1998

Corporate Author:

HONEYWELL TECHNOLOGY CENTER MINNEAPOLISMN

Report Date:

1998-05-01

Pagination or Media Count:

42.0

Abstract:

Performance management includes the methods and technologies used to develop and assure the timing behavior of real-time systems. The reasons for improved performance management include advances in processor technology and architectures, increasingly integrated systems, and the requirement of reducing costs in developing and deploying the systems. These methods include schedulability modeling and analysis, simulation modeling and analysis, and performance instrumentation and testing. The approach used under this program is an integrated use of technologies and methods that leverage the strengths of individual methods while overcoming their weaknesses.

Subject Categories:

  • Aircraft
  • Administration and Management
  • Electrical and Electronic Equipment

Distribution Statement:

APPROVED FOR PUBLIC RELEASE