Accession Number:

ADA383329

Title:

Draft 1997 Sitewide Monitoring Program Report, Eielson Air Force Base, Alaska

Descriptive Note:

Corporate Author:

EA ENGINEERING SCIENCE AND TECHNOLOGY INC FAIRBANKS AK

Report Date:

1998-02-01

Pagination or Media Count:

346.0

Abstract:

Sampling, analysis, and field testing to determine environmental conditions were conducted at Eielson Air Force Base Eielson AFB during the 1997 field season as part of the annual Sitewide Monitoring Program SWMP. The SWMP covers long-term environmental monitoring and restoration of sites at Eielson AFB under the Federal Facilities Agreement FFA and other environmental regulations. Environmental samples were collected during the 1997 field season from sites under investigation. The samples were analyzed for selected chemical constituents based on location-specific rationale developed previously, during the Remedial InvestigationFeasibility Study RIFS, the Source Evaluation Report SER phases, and the 1994, 1995, and 1996 SWMP. The 1997 scope of work was based largely on 1996 SWMP results and consisted of sampling and analyses of groundwater and aquatic biota at several locations on Eielson AFB.

Subject Categories:

  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE