Accession Number:

ADA379455

Title:

The Cost of Implementing Ground- Based Fuel Tank Inerting in the Commercial Fleet

Descriptive Note:

Final technical rept.

Corporate Author:

WILLIAM J HUGHES TECHNICAL CENTER ATLANTIC CITY NJ

Personal Author(s):

Report Date:

2000-05-01

Pagination or Media Count:

60.0

Abstract:

This report documents a cost analysis of ground-based fuel tank inerting for the commercial fleet performed by a group of industry experts lead by an Federal Aviation Administration FAA representative. Ground-based inerting GBI consists of displacing most of the oxygen dissolved in the fuel with nitrogen by a process called fuel scrubbing, and displacing the air in the empty space ullage of the fuel tank, with nitrogen-enriched air NEA in a process called ullage washing. The cost analysis considers the cost of implementing and performing GBI for all US departures carrying more than 19 passengers. The cost of GBI for only departures of airplanes with heated center wing tanks HCWTs was also determined. Airplanes that have the air conditioning equipment, or packs, located below the center wing fuel tanks are considered to have heated center wing tanks. This analysis considered all nonrecurring and recurring costs of GBI at all major U.S. airports over 10 years, with a 3-year start-up period. The cost of modifying the aircraft to allow for GBI was not considered in this analysis.

Subject Categories:

  • Economics and Cost Analysis
  • Fuels

Distribution Statement:

APPROVED FOR PUBLIC RELEASE