Accession Number:

ADA374223

Title:

Department of Defense Base Realignment and Closure. Account IV. Army (BRAC 95) FY 2001 Budget Estimate

Descriptive Note:

Corporate Author:

DEPARTMENT OF THE ARMY WASHINGTON DC

Personal Author(s):

Report Date:

2000-02-01

Pagination or Media Count:

137.0

Abstract:

The Army will implement BRAC 95 BRAC IV as described in the Defense Base Closure and Realignment Commissions report to the President. Consistent with budgets for prior BRAC rounds, no military end strength savings are shown in this plan, since those savings already have been made independent of the BRAC process. Reductions of civilian personnel will occur during FY 96 to FY 01. The resulting savings and eliminations are indicated for each package. Environmental restoration will be funded by the Base Closure Account BCA IV for all years FY96-FY01. This FY01 Budget Estimated Submission reflects current estimates of the environmental requirements based on the available Environmental Baseline Studies EBS and recently completed site level data analysis. The Army established restoration advisory boards a 22 BRAC 95 installations. The BRAC IV cleanup program supports intended reuse base on studies and remedial actions at these BRAC installations.

Subject Categories:

  • Economics and Cost Analysis
  • Logistics, Military Facilities and Supplies

Distribution Statement:

APPROVED FOR PUBLIC RELEASE