Defense Base Realignment and Closure Budget Data for the Construction of the Overwater Antenna Test Range Facility at Newport, Rhode Island

Descriptive Note:

Audit rept

Corporate Author:

INSPECTOR GENERAL DEPT OF DEFENSE ARLINGTON VA

Personal Author(s):

Report Date:

1996-04-26

Pagination or Media Count:

15.0

Abstract:

The overall audit objective was to determine the accuracy of BRAC MILCON budget data. The specific objectives were to determine whether the proposed project was a valid BRAC requirement, whether the decision for MILCON was supported with required documentation including an economic analysis, and whether the economic analysis considered existing facilities. The audit also assessed the adequacy of the management control program as it applied to the overall audit objective. The management control program objective will be discussed in a summary report on FY 1997 BRAC MILCON budget data.

Subject Categories:

  • Administration and Management

Distribution Statement: