Accession Number:

ADA357405

Title:

Overall Quality Assurance Project Plan, Remedial Investigation/Feasibility Study Fort Sheridan, Illinois, Volume 1.

Descriptive Note:

Corporate Author:

ENVIRONMENTAL SCIENCE AND ENGINEERING INC GAINESVILLE FL

Personal Author(s):

Report Date:

1995-03-15

Pagination or Media Count:

798.0

Abstract:

This Overall Quality Assurance Project Plan OQAPP has been prepared as a component of Delivery Order No. 2 of Contract DAAA15-90-D-0017. The purpose of this OQAPP is to define responsibilities and authorities, and to prescribe requirements for assuring that the remedial investigation RI and feasibility study FS for Fort Sheridan are planned and executed in a manner consistent with U.S. Army Environmental Center USAEC, U.S. Environmental Protection Agency EPA Region V, and Illinois Environmental Protection Agency IEPA quality assurance QA objectives. This OQAPP provides guidance and specifications to ensure that 1 Field determinations and laboratory analytical results are of known quality and are valid, consistent, and compatible with the USAEC chemical database through the use of approved methods, preventive maintenance procedures, calibration and analytical protocols, quality control QC measurements, reviews, and audits. 2 Samples are obtained using appropriate, documented procedures identified uniquely and controlled through sample tracking systems and chain-of-custody procedures. 3 Records are retained as documentary evidence of the quality of samples, applied processes, equipment, and results.4 Generated data are validated. 5 Calculations and evaluations are accurate, appropriate, and consistent throughout the project.

Subject Categories:

  • Solid Wastes and Pollution and Control
  • Environmental Health and Safety

Distribution Statement:

APPROVED FOR PUBLIC RELEASE