Accession Number:

ADA330822

Title:

Energy Engineering Analysis Program (EEAP), Fort Sill Army Base, Volume 1 - Executive Summary, Increments F and G

Descriptive Note:

Final rept.

Corporate Author:

ENERGY MASTERS CORP DALLAS TX

Personal Author(s):

Report Date:

1982-01-01

Pagination or Media Count:

29.0

Abstract:

Included in this summary are the data and results of the first five energy analysis and study increments A, B, C, D and E which were developed under a previous contract to provide a Basewide Energy Systems Plan for the Fort Sill Army Base at Lawton, Oklahoma. Also included in this Summary are the data and results of increments F and G that are the responsibility of Energy Masters Corporation. The primary goals outlined in the scope of work for this study are as follows 1 Develop low cost energy conservation projects within the Facilities Engineer Funding Authority. 2 Update and modify, as required, energy conservation projects developed in Increments A, B, C, D, and E. 3 Combine all proposed energy conservation projects into one comprehensive list. 4 List the recommended projects in an order of priority based on each projects savings investment ratio SIR. Also schedule the construction of the recommended projects. 5 Calculate energy and cost savings and project basewide energy consumption after implementation of recommended projects. This submittal is based on work done for Increments F and G as outlined in the Prenegotiation Meeting and Manual DAEN-MPE-E entitled Scope of Work for Energy Engineering Analysis Program EEAP paragraphs 3.5.6 and 3.5.7. See page 1 Appendix for complete text of Prenegotiation Meeting.

Subject Categories:

  • Non-electrical Energy Conversion
  • Logistics, Military Facilities and Supplies

Distribution Statement:

APPROVED FOR PUBLIC RELEASE