Accession Number:

ADA330820

Title:

Final Submittal: Increments A, B, F. & G, Fort Story, Energy Engineering Analysis Program: Executive Summary

Descriptive Note:

Final rept.

Corporate Author:

MMM DESIGN GROUP WASHINGTON DC

Personal Author(s):

Report Date:

1985-01-01

Pagination or Media Count:

34.0

Abstract:

The objective of this is a summary of an Energy Engineering Analysis, conducted to provide a Basewide Energy Savings Plan at Fort Story, Virginia. This Plan includes recommendations for energy conservation Projects to reduce the installations present energy consumption, as well as a description of other energy-related factors which affect consumption. It is important to note that savings figures presented in this summary can only be realized after all Projects have been implemented. MMM Design Group has developed Projects that meet the funding requirements for the D.O.D.s Energy Conservation Investment Program. Furthermore, the recommended Projects provide compliance with the Army Facilities Energy Plan. This summary presents data relative to the following chronological period A 1975 Energy Consumption baseline. B 1985 Energy Use projection. The programmed projects developed in this analysis, along with other energy use factors described further in the Basewide Energy Savings Plan, have resulted in a 43 projected reduction in Fort Storys energy consumption by FY 1985. This Analysis Program was conducted in accordance with the DAEN-MPE-E scope of work for Energy Engineering Analysis Program EEAP, revised 4 May 1981. The analysis conforms with the NAOEN-MA Norfolk District Energy Conservation Investment Program ECIP guidance, dated 10 November 1980. Further Addenda are provided to update the analysis results in accordance with Energy Conservation Investment Program ECIP guidance, revised 31 December 1982.

Subject Categories:

  • Non-electrical Energy Conversion
  • Logistics, Military Facilities and Supplies