DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADA330478
Title:
Energy Savings Opportunity Survey, Energy Engineering Analysis Program (EEAP) Fort Campbell, Kentucky. Phase I, Volume 3. Sections 5-15
Descriptive Note:
Final rept
Corporate Author:
SYSTEMS ENGINEERING AND MANAGEMENT CORP KNOXVILLE TN
Report Date:
1993-11-12
Pagination or Media Count:
271.0
Abstract:
The ECO evaluation consisted of selecting a ground water heat pump and a system configuration to evaluate. A ground water coupled heat pump with a seasonal energy efficiency rating SEER of 14 was selected for evaluation. The system configuration consisted of a one for one replacement of heat pumps and separate supply and return wells serving every two heat pumps. Bin weather data was utilized in a spreadsheet format to model the annual energy consumption of both the existing system and the proposed systems. The most significant cost for the groundwater coupled heat pump is the well systems. The project did not have an attractive simple payback when evaluated with a dedicated supply and return well for each heat pump. This section contains the programming documentation for ECIP Project 3, installation of ground water coupled heat pumps. Included are the project development brochures, 1391 forms, life cycle cost analysis, cost estimates for the entire project, and energy calculations for each family housing area. Catalog cut sheets are included as an appendix to the document located at the end of this section to represent the replacement products.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE