Title:

Energy Engineering Analysis Program for the 193rd Infantry Brigade (Panama). Executive Summary, Phase III

Descriptive Note:

Final rept

Corporate Author:

HEERY ENERGY CONSULTANTS INC ATLANTA GA

Personal Author(s):

Report Date:

1983-09-01

Pagination or Media Count:

22.0

Abstract:

A 14-month long Energy Engineering Analysis Program EEAP has been conducted for the 193d Infantry Brigade. The EEAP identified nine ECIP Projects Increment A and Increment B, four non-ECIP Projects Increment G and fourteen Facility Engineer Energy Conservation Measures Increment F. Five of the nine ECIP Projects were expedited for submission in June 1983 for funding in FY 86. One of the ECIP Projects is for DODDS. Twenty other Energy Conservation Measures were investigated, but not recommended. A two-volume Final Report was prepared in October 1983 and six copies delivered to the Installation. Two copies went to FORSCOM and other copies to the Corps Panama Area Engineer, District Engineer, Huntsville Division Engineer, South Atlantic Division Engineer and others. Volume I is Narrative and Supporting Data and Volume II is Project Documentation. For the 15 recommended Projects, complete programming documentation has been prepared. If all 13 were implemented, the Brigades total energy consumption electricity plus DFM would be reduced by 14 percent and the Brigade would save about 3,200,000 a year. Implementation of the Increment F items would save an additional 164,000 yearly. A prioritized list of energy conservation measures appears later in this Executive Summary. It is important to note that many of the recommended energy conservation measures also qualify for PCIP and QRIP funding and should be simultaneously submitted for funding under these programs.

Subject Categories:

  • Non-electrical Energy Conversion
  • Military Forces and Organizations