Accession Number:

ADA312401

Title:

Installation Restoration Program. Site Investigation Report. Volume 1. Alabama Air National Guard 187th Fighter Group Dannelly Field Municipal Airport Montgomery, Alabama.

Descriptive Note:

Corporate Author:

MARTIN MARIETTA ENERGY SYSTEMS INC OAK RIDGE TN

Personal Author(s):

Report Date:

1995-11-01

Pagination or Media Count:

127.0

Abstract:

The Air National Guard Readiness CenterCBVR ANGRC has initiated an Installation Restoration Program IRP in response to the policies of the Department of Defense DOD. The IRP has been developed as a phased program for identifying and addressing environmental contamination caused by past practices at Air National Guard- ANG installations. The overall objective of the ANG IRP is to identify and address the potential environmental problem sites at ANG installations. Additionally, the ANG IRP will provide timely remediation as required to protect the public health and environment from contamination associated with hazardous waste spill sites. A Site Investigation SI was conducted as part of the IRP for the 187th Fighter Group of the Alabama National Guard, Dannelly Field Municipal Airport, Montgomery, Alabama the base. The SI was conducted in accordance with the SI Work Plan dated December 1990 and followed the 1987 Preliminary Assessment PA at the base that identified five sites that were potential sources of environmental contamination.

Subject Categories:

  • Hydrology, Limnology and Potamology
  • Soil Mechanics
  • Solid Wastes and Pollution and Control
  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE