Installation of Additional 80 GPM Water Treatment Capacity Pilot Project, Phase 2, Mod 2, New Boston Air Force Station, New Hampshire.

Descriptive Note:

Final rept. Jan-Jun 95,

Corporate Author:

ENVIRONMENTAL SCIENCE AND ENGINEERING INC AMHERST NH

Personal Author(s):

Report Date:

1995-08-01

Pagination or Media Count:

133.0

Abstract:

This report summarizes activities related to the installation of the second phase of a pilot water treatment system at the New Boston Air Force Station in New Hampshire. This project included the installation, in the Spring of 1995, of an 80 gpm air stripper system to remove radon from a drinking water supply and to reduce the corrosivity of that water. The source consists of bedrock wells with high radon concentration. jg p4