Accession Number:

ADA303447

Title:

Closure Plan for the Basin F Interim Response Action Structures.

Descriptive Note:

Corporate Author:

RUST ENVIRONMENT AND INFRASTRUCTURE INC DENVER CO

Personal Author(s):

Report Date:

1994-09-01

Pagination or Media Count:

98.0

Abstract:

This document presents the Armys final closure plan for four basin F interim response action structures at RMA. These structures include Pond A, Pond B, the tank farm, and the submerged quench incinerator SQI. Pond A, Pond B, and the tank farm were constructed to temporarily store liquid from basin F until a treatment and disposal method could be selected. The disposal method was later determined to be incineration in the SQI. Section 2 of this plan presents a general description of the RMA facility and the basin F IRA structures, section 3 presents a detailed discussion of the closure process and associated waste management, section 4 describes the anticipated schedule for closure of the basin F IRA structures, section 5 provides a contingency closure plan, and section 6 provides a list of references used in this document.

Subject Categories:

  • Logistics, Military Facilities and Supplies
  • Solid Wastes and Pollution and Control
  • Water Pollution and Control
  • Pesticides Pollution and Control
  • Environmental Health and Safety

Distribution Statement:

APPROVED FOR PUBLIC RELEASE