Accession Number:
ADA295551
Title:
Cutoff Walls and Cap for Lime and M-1 Settling Basins, Rocky Mountain Arsenal, Colorado. Part 1: Final Design Analysis.
Descriptive Note:
Final rept.,
Corporate Author:
ROCKY MOUNTAIN ARSENAL DENVER CO
Report Date:
1990-10-01
Pagination or Media Count:
346.0
Abstract:
This document consists of 2 parts Final design analysis, and specifications. The purpose of the project was to develop a design for the Interim Response Actions IRA at the Lime and M-l Settling Basins at Rocky Mountain Arsenal RMA, Commerce City, Colorado. The purpose of the IRA at the Lime and M-l Settling Basins is to mitigate the threat of release from the Basins on an interim basis, pending determination of the final remedy in the Onpost Record of Decision ROD. The IRA for the M-l Basins also includes treatment of the waste materials in the basins with in-situ vitrification ISV, which is being designed by contract with Woodward-Clyde Consultants. MM
Distribution Statement:
APPROVED FOR PUBLIC RELEASE