DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADA295487
Title:
In Situ Vitrification, M-1 Settling Basins, FY91 Concept (30%) Design Document.
Descriptive Note:
Corporate Author:
WOODWARD-CLYDE CONSULTANTS DENVER CO
Report Date:
1990-09-01
Pagination or Media Count:
257.0
Abstract:
This conceptual design document outlines the steps required to implement the in-situ vitrification process in the M-1 settling basins. The report is divided into the following sections 1 Introduction. 2 Overview of concept design - general description of process, site specific considerations, off-gas system. 3 Design analysis - requirements. 4 Draft specifications. 5 Drawings - bound separately. 6 Cost estimate Appendices include A Design support documentation - ARARs, vendor information, design calculations. B Value engineering study of Stanley consultants. MM
Distribution Statement:
APPROVED FOR PUBLIC RELEASE