Final Decision Document for the Interim Response Action at the Lime Settling Basins, Rocky Mountain Arsenal, Version 4.0.
Descriptive Note:
Corporate Author:
WOODWARD-CLYDE CONSULTANTS DENVER CO
Report Date:
1990-03-01
Pagination or Media Count:
55.0
Abstract:
The objective of the interim response action at the lime settling basins is to mitigate the threat of releases from the basins. The proposed IRA consists of 1 Relocation of sludge material to the settling basin, 2 Construction of a 360 degree subsurface barrier around the basins, 3 Construction of a soil and vegetative cover over the material, 4 Installation of a ground water extraction system. This decision document provides summaries of 1 alternative technologies considered, 2 Significant events leading to the initiation of the IRA, 3 The IRA Project, 4 Applicable or relevant and appropriate requirements, standards, criteria, and limitations ARARs associated with the program.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE