Accession Number:

ADA291464

Title:

Storm Water Pollution Prevention Plan for Construction Activities.

Descriptive Note:

Final contractor rept. 1 Mar 93-1 Mar 94,

Corporate Author:

ENGINEERING-SCIENCE INC ATLANTA GA

Personal Author(s):

Report Date:

1994-09-01

Pagination or Media Count:

261.0

Abstract:

All construction sites as Robins AFB, Georgia with disturbed land area of five acres or greater are required to obtain a permit from the Georgia Environmental Protection Division to discharge storm water. Obtaining the storm water discharge permit is a two-step process Submitting a Notice of Intent to discharge storm water and Compliance with the State of Georgias General Permit requirements. A primary component of compliance with Georgias General Permit requirements is the preparation and implementation of a Stormwater Pollution Prevention Plan SWPPP. This document is organized to function as a guide to meet SWPPP requirements. The step-by-step guidelines and checklists show the process of developing and implementing a SWPPP for construction sites at Robins AFB, GA. -BKA

Subject Categories:

  • Hydrology, Limnology and Potamology
  • Soil Mechanics
  • Civil Engineering
  • Solid Wastes and Pollution and Control
  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE