Accession Number:

ADA289914

Title:

Test Plan for Preliminary Study of Inorganic Contaminant Removal From RMA Groundwater.

Descriptive Note:

Corporate Author:

ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG MS

Personal Author(s):

Report Date:

1978-02-01

Pagination or Media Count:

106.0

Abstract:

This document consists of a major report on inorganic contaminant removal from ground water. In this plan, WES has been requested by the OPM-CDIR to conduct a literature review and preliminary laboratory treatability studies on various source waters at RMA. Recommendation is that the determination of suitable treatment processes be based on both engineering and economic analysis and that the processes be compatible with the organic contaminant treatment processes under study activated carbon adsorption and ultravioletozone oxidation. The amendment to the test plan presents the inorganic treatment processes found from the literature to be applicable to the inorganic contaminants in RMA ground water and outlines the bench scale study to be conducted at WES using the potential processes. The rest of the document is correspondence and reports on various water treatability. jg

Subject Categories:

  • Inorganic Chemistry
  • Physical Chemistry
  • Logistics, Military Facilities and Supplies

Distribution Statement:

APPROVED FOR PUBLIC RELEASE