Accession Number:

ADA289114

Title:

Basin F Interim Response Action Support. Version 3.1.

Descriptive Note:

Final technical plan.

Corporate Author:

EBASCO SERVICES INC LAKEWOOD CO

Personal Author(s):

Report Date:

1987-12-01

Pagination or Media Count:

19.0

Abstract:

The primary objective of Task 31 is to provide support for the supplemental Basin F activities to be conducted by the PM. The specific objectives are 1 Perform sampling and analysis of soil, liquid, surface water, and ground water in and around Basin F 2 Perform technical assessments on the proposed Basin F interim response actions 3 Conduct liquid level measurements and estimate volume of liquid in Basin F 4 Determine if the liquid in the southern pools can be treated by conventional methods 5 Assess the risk from off-gassing. This document presents a general approach for the potential work assignments. Sections provide information on sampling techniques, chemical analysis, quality control, health and safety programs, and data management.

Subject Categories:

  • Logistics, Military Facilities and Supplies
  • Water Pollution and Control
  • Environmental Health and Safety

Distribution Statement:

APPROVED FOR PUBLIC RELEASE