Accession Number:

ADA288940

Title:

Final Decision Document for the Interim Response Action for the Groundwater Intercept and Treatment System, North of Basin F, Rocky Mountain Arsenal.

Descriptive Note:

Corporate Author:

ROCKY MOUNTAIN ARSENAL DENVER CO

Personal Author(s):

Report Date:

1988-12-01

Pagination or Media Count:

89.0

Abstract:

The specific objectives of the interim response action for the ground water intercept and treatment system North of Basin F are to initiate capture of the contaminated alluvial aquifer water from below Basin F, collect operational data on the interception, treatment, and recharge of contaminated ground water in this area that will aid in the design of a final response action. This proposed decision document provides summaries of alternatives considered, significant events leading to the initiation of the IRA, the IRA Project, the applicable or relevant and appropriate requirements ARARs. The preferred system will consist of withdrawal wells, carbon adsorption filters, and recharge wells.

Subject Categories:

  • Logistics, Military Facilities and Supplies
  • Air Pollution and Control
  • Noise Pollution and Control
  • Solid Wastes and Pollution and Control
  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE