Accession Number:
ADA288636
Title:
The U.S. Submarine Production Base : An Analysis of Cost, Schedule, and Risk for Selected Force Structures. Executive Summary,
Descriptive Note:
Corporate Author:
RAND CORP SANTA MONICA CA
Report Date:
1994-01-01
Pagination or Media Count:
39.0
Abstract:
Our study thus had three purposes To determine the practicality of extending the current gap between submarine starts, given the time required to restart production. We wanted to make sure we took into account the full potential advantages of deferring the length of the gap-the longer production is put off, the more money should be saved. So we sought to find the longest gap possible that still allowed meeting force objectives. To compare the cost of producing submarines after the longest gap practical with that of continuing production. This is equivalent to determining which is greater-the savings from postponing production or the offsetting costs of shutdown and restart-and by how much. To characterize the largely unquantifiable risks involved in a reconstitution strategy.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE