Title:

Cost/Schedule Control Systems Criteria Interpretation Differences Between the DoD and its Contractors

Descriptive Note:

Master's thesis

Corporate Author:

AIR FORCE INST OF TECH WRIGHT-PATTERSON AFB OH SCHOOL OF LOGISTICS AND ACQUISITION MANAGEMENT

Report Date:

1994-09-01

Pagination or Media Count:

241.0

Abstract:

This study attempted to identify the major interpretive differences of the CostSchedule Control Systems Criteria CSCSC between Department of Defense DoD and contractor performance management professionals, and to understand why these differences occurred. As the study progressed, its focus shifted to an evaluation of the Interpretive Guide, an Air Force Institute of Technology AFIT published document used to assist in the understanding of the criteria elements. The objective of the evaluation was to determine if the Interpretive Guides explanations of the criteria elements were in consonance with the intent of the criteria and with current practice in the field of performance management. Research packages were distributed to and collected from performance management professionals in the DoD and its contractors. No distinct interpretative differences of the criteria were found between the two groups but a number of suggestions to improve the content of the Interpretive Guide were suggested some of the recurring suggestions were to address the concept of integrated product teams and the development of procedures to streamline the area of variance analysis reporting. Respondents comments were published in an appendix and summarized within the text. Recommendations were to update the Interpretive Guide as well as to perform further research.

Subject Categories:

  • Administration and Management
  • Economics and Cost Analysis

Distribution Statement:

APPROVED FOR PUBLIC RELEASE