Accession Number:

ADA281355

Title:

Basewide Groundwater Operable Unit. Groundwater Operable Unit Remedial Investigation/Feasibility Study Report. Volume 2

Descriptive Note:

Final rept.

Corporate Author:

CH2M HILL SACRAMENTO CA

Personal Author(s):

Report Date:

1994-06-01

Pagination or Media Count:

782.0

Abstract:

This report has been prepared for the Air Force by CH2M HILL for the purpose of aiding in the implementation of a final remedial action plan under the Air Force Installation Restoration Program IRP. Because the report relates to actual or possible releases of potentially hazardous substances, its release prior to an Air Force final decision on remedial action may be in the publics interest. The limited objectives of this report and the ongoing nature of the IRP, along with the evolving knowledge of site conditions and chemical effects on the environment and health, must be considered when evaluating this report, since subsequent facts may become known that may make this report premature or inaccurate. Acceptance of this report in performance of the contract under which it is prepared does not mean that the Air Force adopts the conclusions, recommendations, or other views expressed herein, which are those of the contractor only and do not necessarily reflect the official position of the Air Force.

Subject Categories:

  • Hydrology, Limnology and Potamology
  • Logistics, Military Facilities and Supplies
  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE