DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADA281220
Title:
Operating Rules from HEC-PRM Results for the Missouri River System: Development and Preliminary Testing
Descriptive Note:
Final rept.
Corporate Author:
HYDROLOGIC ENGINEERING CENTER DAVIS CA
Report Date:
1994-05-01
Pagination or Media Count:
141.0
Abstract:
The report describes the development and testing of preliminary reservoir operation plans for the main stem Missouri River system using deterministic optimization results from the Hydrologic Engineering Center Prescriptive Reservoir Model HEC-PRM. The results are preliminary, with limitations noted in text. The reservoir operating rules presented are inferred directly from HEC-PRM and refined and tested using a coarse simulation model. Further detailed simulation modeling is required to more completely assess the value of suggestions for system operations presented. Prescriptive Reservoir Model, Network Flow, Linear Programming, Penalty Functions, Operation Rules, Storage Allocation, Missouri River Main Stem Reservoir
Distribution Statement:
APPROVED FOR PUBLIC RELEASE