Accession Number:

ADA277445

Title:

Focused Feasibility Study Final Field Sampling Plan

Descriptive Note:

Corporate Author:

ABERDEEN PROVING GROUND MD ENVIRONMENTAL MANAGEMENT PROGRAM

Personal Author(s):

Report Date:

1993-10-01

Pagination or Media Count:

59.0

Abstract:

At the direction of APG-DSHE, the project has been separated into three work phases to allow for data evaluation and risk determination before a full focused feasibility study is conducted. Phase I of the project consists of an aerial photography investigation, surfacemarine geophysical surveys, a flowmeter logging program, sampling surface and subsurface soils, an ecological risk assessment of the Beach Point Test Site, and analysis of chemical groundwater data generated through the separate Canal Creek Groundwater Monitoring Program. Tasks described for Phase II of the FFS will be performed upon evaluation of data needs identified subsequent to completion of the Phase I tasks. Phase II investigations include installation fo additional groundwater monitoring wells, sampling of the new and previously existing monitoring wells, a flowmeter logging program, downhole geophysical logging of new monitoring wells and one previously existing well, and possible soil gas surveys

Subject Categories:

  • Physical and Dynamic Oceanography
  • Logistics, Military Facilities and Supplies
  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE