Accession Number:

ADA276057

Title:

Compliance Emission Testing of the Central Heating and Power Plant, Eielson Air Force Base, Alaska

Descriptive Note:

Final technical rept. 10-14 May 1993

Corporate Author:

ARMSTRONG LAB BROOKS AFB TX BIOENVIRONMENTAL ENGINEERING DIV

Personal Author(s):

Report Date:

1993-12-01

Pagination or Media Count:

114.0

Abstract:

Compliance emission testing for particulate matter and visible emissions was conducted on Boiler 3 at the Eielson AFB Central Heat and Power Plant. Compliance standards are found in Operating Permit No. 9331-AA001, issued by the State of Alaska on 30 April 1993. Initial testing was performed on 11 May 1993. Results from this test indicated that Boiler 3 met the standard for visible emissions but was above the standard for particulate matter emissions. Operating parameters were adjusted and Boiler 3 was retested on 13 May 93. Results from the 13 May test indicated that all emission standards were met. Particulate matter, Visible emissions, Eielson AFB, Central heat and power plant, Compliance emission testing.

Subject Categories:

  • Air Conditioning, Heating, Lighting and Ventilating
  • Air Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE