Accession Number:

ADA257892

Title:

Upgrade Precision Runway Monitor (PRM) Operational Test And Evaluation (OT and E) Test Plan

Descriptive Note:

Corporate Author:

FEDERAL AVIATION ADMINISTRATION TECHNICAL CENTER ATLANTIC CITY NJ

Report Date:

1992-10-01

Pagination or Media Count:

43.0

Abstract:

This document defines the Upgrade Precision Runway Monitor Upgrade PRM Operational and Integration tests that will be conducted at the Federal Aviation Administration FAA Operational facilities. These tests will be executed at Raleigh-Durham Airport RDU following the Contractor Site Acceptance Test. The Upgrade PRM test configuration is addressed in conjunction with the associated interfaces which will be required to perform the testing in as near an operational environment as possible. The Air Traffic AT Operational requirements and test objectives are contained in this test plan. In addition to providing requirements traceability, this plan contains a description of the tests which will be executed, associated success criteria, roles and responsibilities of test personnel, and the overall flow of activities required for a successful test program.

Subject Categories:

  • Terminal Flight Facilities
  • Air Navigation and Guidance

Distribution Statement:

APPROVED FOR PUBLIC RELEASE