Accession Number:

ADA256255

Title:

Seven-Year Summary of Fort Irwin, CA, Family Housing Comparison Test: Operation and Maintenance Costs of Manufactured vs. Conventionally Built Units

Descriptive Note:

Final rept.

Corporate Author:

CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL

Personal Author(s):

Report Date:

1992-07-01

Pagination or Media Count:

61.0

Abstract:

To determine if manufacturedfactory-built family housing is more cost-effective in providing housing than conventional construction, Congress directed that a test be conducted of construction methods. In 1982, Congress authorized the construction of 200 units of manufacturedfactory-built housing at Fort Irwin, CA, and concurrently, 144 units of conventionally built units. Congress directed the Department of Defense DOD to conduct a fair and reliable study comparing the operation and maintenance O and M costs of manufactured housing to those of conventional housing. DOD reported to Congressional committees on the conditions and parameters under which this test would be conducted and the results of the test after the housing had been in use for 5 years. The Assistant Secretary of the Army for Installations, Logistics and Environment requested that the study be extended beyond the 5 years. This report compares the first 7 years of OM costs. Fort Irwin, CA, family housing, building components.

Subject Categories:

  • Economics and Cost Analysis
  • Structural Engineering and Building Technology
  • Military Forces and Organizations

Distribution Statement:

APPROVED FOR PUBLIC RELEASE