Accession Number:

ADA254409

Title:

GNAS Maintenance Control Center (GMCC) Design Qualification Test and Evaluation (DQT and E) Test Report

Descriptive Note:

Technical note

Corporate Author:

FEDERAL AVIATION ADMINISTRATION TECHNICAL CENTER ATLANTIC CITY NJ

Personal Author(s):

Report Date:

1992-07-01

Pagination or Media Count:

134.0

Abstract:

This report presents the results of Design Qualification Test and Evaluation DQT and E testing of the General National Airspace System GNAS maintenance Control Center GMCC. As Test Director, ACN-250 conducted testing at the Federal Aviation Administration FAA Technical Center, Atlantic City International Airport, New Jersey. The purpose of DQT and E testing is to verify that the phase I and phase II GMCC design requirements are met. The requirements were successfully demonstrated with some minor problems. However, due to an incomplete test configuration, ACN-250 recommended retesting the system with a four GMCC network.

Subject Categories:

  • Terminal Flight Facilities
  • Commercial and General Aviation
  • Computer Systems

Distribution Statement:

APPROVED FOR PUBLIC RELEASE