Title:

Full-Scale Incineration System Demonstration at the Naval Battalion Construction Center, Gulfport, Mississippi. Volume 6. Project Management/Site Services

Descriptive Note:

Final rept. Sep 1986-Feb 1989

Corporate Author:

EG AND G IDAHO INC IDAHO FALLS

Personal Author(s):

Report Date:

1991-07-01

Pagination or Media Count:

98.0

Abstract:

The demonstration program consisted of three phases. The first phase, the Verification Test Burn, demonstrated the effectiveness of the 100 tonday incinerator to destroy soil contaminated with constituents of HO, in particular 2,3,7,8-tetrachlorinated dibenzo dioxin 2,3,7,8-TCDD. The second phase demonstrated the ability of the incinerator to meet the requirements of the Resource Conservation and Recovery Act RCRA of 1976, as amended, which specifies that the incinerator must meet or exceed a Destruction and Removal Efficiency of 99.9999. The third phase determined the cost and reliability of using the incineration on a long-term basis. This report summarizes the daily activities during operations at the NCBC and the Idaho National Engineering Laboratory INEL project management oversight.

Subject Categories:

  • Pesticides Pollution and Control
  • Water Pollution and Control