Accession Number:

ADA244924

Title:

Construction Foundation Report. Mud Mountain Dam Seepage Control Cutoff Wall, White River, Washington. Appendix.

Descriptive Note:

Corporate Author:

CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT

Personal Author(s):

Report Date:

1991-08-01

Pagination or Media Count:

375.0

Abstract:

This appendix contains data from sampling and tests on the following 1 Access shaft Core soil testing data 2 Access shaft daily logs 3 Bentonite slurry tests 4 Hydrofraise productivity data 5 Cutoff wall concrete aggregate gradations 6 Cutoff wall concrete data 7 Exploratory drilling logs and pressure tests and 8 Dam Raising embankment materials data.

Subject Categories:

  • Civil Engineering
  • Structural Engineering and Building Technology
  • Construction Equipment, Materials and Supplies
  • Soil Mechanics

Distribution Statement:

APPROVED FOR PUBLIC RELEASE